Wednesday, May 18, 2011

Ready for Inspection

Looks like we are just waiting for the stairs to be varnished and then dry, then we are ready for the final inspection.

Stairs are stained, the only way upstairs is to go up the garage stairs into the attic, then out the attic door into the second floor hallway.  Inconvenient, but at least they can keep working on the floors upstairs.


The cabinet maker made our stairs.  I was very impressed with his work. 


The Bosch cooktop has been installed in the island.


Fridge installed.  Fits perfectly in its little cabinet


We picked a french door model. 


The cabinet allows just enough room to fully open both doors


Dishwasher also installed.  I can't wait to use this.  I have never had one before.

So, one more day of paint and drying time, then the final inspection on Friday.  As long as that passes, I get the keys to move in Friday afternoon.