Monday, May 9, 2011

Granite and Plumbing Installation

The granite countertops are goign in.  The kitchen is almost done and then they are moving on to the bathrooms. 

I bought enough tile for them to do a backsplash also. 


There are three of them on the tile crew, so things go fast.


Four toilets were installed today.  All dual-flush water savers.


Hot water heater installed in garage.


Railings were installed on front porch.  Same railings go on rear balcony.