Wednesday, April 27, 2011

Kitchen Cabinets

With only 2 1/2 weeks to go before move-in, our kitchen cabinets finally started going in.  There are some pieces missing, the island and the wall oven section.

sitting in dining area waiting to be installed


Lower cabinet


Upper cabinet for built in microwave


cabinet for french-door fridge


Peninsula with sink and bar seating


Cabinet makers hard at work


set in place, ready for stain, then granite


Front door also arrived today and was installed


What a mess of wires.  The electrician has lots to do still.