Tuesday, April 19, 2011

Interior Trim and Paint

I love that we are getting down to the finishing interior details.  The trim moulding is in and the doors are up.  The painter will be done with the interior paint by Friday and on Monday, the electrician can come back and install the outlets, switches, lighting, and ceiling fans.  The AC guy can come in and install the upstairs and downstairs airhandlers. 
The trim has been primed and is ready for the paint.


The stairs spindles have been primed also.  They get painted white, along with the risers.  The stair treads, landing, and hand rails are all stained to match the wood floors. 


The brick now goes all the way around the house.  Just the second story is left to cover.


Brick columns going up in the back


and in the front.