They actually did a lot today.
The did the whole side and started around the back. They go all the way around the house once, then bring in the scaffolding and go around again for the second floor. That way the bottom mortar has a chance to set.
Inside the house, the trim is going in around the windows.
The painter should start on Monday working on trim and doors.
Inside the closets, the shelves and rods are being installed.
Here is a better shot of one of the closet build-ins. This is upside down.