On the left side of the photo that is the upstairs guest room. On that rear wall, you see a big opening for the double window in the master bedroom, then just to the right of that, an opening for the french door that leads from the master sitting room out onto the second floor patio. The right side construction continues the master sitting room into the master bathroom, walk in closet, and upstairs laundry room.
That last door you see (barely see) walks directly into the attic storage. The small window next to that is in the upstairs laundry.
That's all for this weekend. Sunday isn't a workday. We will resume on Monday morning. Just an update on some other progress. All the rest of the appliances have been ordered. We found the oven on sale a week ago and bought it from Lowes. Since I wanted matching appliances, as much as possible, I found a Bosch Cooktop and Bosch Dishwasher on sale at sears and ordered them both. The fridge also has been ordered. It is a Samsung french door 26CF. I also ordered the Island vent hood and that is scheduled to be delivered on Monday. Everything goes into storage in our contractors warehouse until it is needed.