The pest control man was out today spraying underneath the foundation for termites.
Once that was done, it was time to put down the plastic liner and then the rebar.
You can see that the plumbing is covered at this point. The building permit has a signature from the plumbing inspector that it had passed the inspection.
You can see the heavy rebar down in the footings. Almost time for the concrete.
This was the other accomplishment today. They finally came out and installed the water meter. We needed this to be done before we could pour concrete.
2 gallons used and counting.